Advertisement

Artifical Reef Off Little Tybee Enhanced

DNR and Coast Guard partner to deploy concrete sinkers to enhance reef 4 miles offshore.

DNR Press Release | June 13, 2019

The Coastal Resources Division (CRD) of the Georgia Department of Natural Resources recently deployed 800 cubic feet of donated concrete sinkers as an enhancement to artificial beach reef BSF.

The BSF reef is located 4 nautical miles southeast of Little Tybee Island. This is the second deployment of materials at BSF Reef in partnership with the U.S. Coast Guard (USCG).

The donated concrete sinkers were formerly used to moor navigational buoys and were donated at the end of their lifespan to Georgia’s Artificial Reef Program. The buoy tender Coast Guard Cutter Willow deployed the concrete materials in 29 feet of water grouped in line between 31˚ 54.103’ latitude, -80˚ 50.071’ longitude and 31˚ 54.152’ latitude, -80˚ 50.135’ longitude, in the northwest quadrant of the reef.

The concrete materials will provide a stable surface in an environment characterized by strong currents and wave action. Materials will be quickly colonized by barnacles, soft corals and sponges. These organisms will provide the basis of a food web that will attract saltwater gamefish such as sheepshead, black sea bass and king mackerel, as well as numerous other species that use the reef as foraging and refuge habitat.

CRD staff will monitor the site using side-scan sonar to document the structural integrity of the materials, and will also use scuba surveys to document the fish and invertebrate abundance and diversity.

The U.S. Coast Guard Cutter WILLOW is a 225-foot sea going buoy tender homeported in Charleston, South Carolina.

Become a GON subscriber and enjoy full access to ALL of our content.

New monthly payment option available!

Advertisement

Leave a Comment

You must be logged in to post a comment.

Advertisement